Project Description

CUPLOCK SCAFFOLDING

Cuplock scaffolding system is a multi-purpose system scaffold, suitable for access and formwork support in all types of construction of building & civil engineering projects. This complete galvanized system is probably the fastest and most-widely preferred scaffold system. The main feature of Cup-Lock is the unique node locking method which allows up to four horizontal members to be fastened to a vertical member in one action by a single hammer blow – without the use of nuts and bolts or wedges.

The locking node is formed by two cups, a fixed lower cup which is welded to the vertical member at every 500mm intervals and a sliding upper cup. First the forged blade ends of the horizontal member are connected loosely but safely to the lower cup.

The key strength of Cup-Lock scaffolding system is being extremely versatile. It is ideal for many applications as formwork support, or general access scaffold, staircase tower, mobile tower and table form. It has flexible erection as straight, curved or circular configuration for both access and support purposes.

HDG DROP FORGED CUPLOCK SCAFFOLDING
Material: Q235/Q345
Surface treatment: Painting ,Hot Dip Galvanized
Application: Building Construction
Standard: EN74/BS1139
Thickness: 2.75/3.0/3.2mm
Name: Cuplock
Outer tube OD: 48.3mm
Certificate: SGS
Color: Silver, blue, Green

Ask for price